1·It criticizes the main contractor for seriously erring in its estimates.
它批评主承包商在估算中严重出错。
—— 《柯林斯英汉双解大词典》
2·We told the building contractor that we wanted a garage big enough for two cars.
我们告诉建筑承包商,我们想要一个可以停放两辆汽车的车库。
—— 《柯林斯英汉双解大词典》
3·A bad contractor may hide mistakes or blame someone else and nickel-and-dime you with extra charges.
一个不道德的承包商可能会隐瞒自身的失误或归咎他人,以额外的收费耗尽你的经费。
—— 《柯林斯英汉双解大词典》
4·A contractor was hired to drain the reservoir and to excavate soil from one area for replacement with clay.
一个承包商被雇来排干蓄水池里的水,然后挖出其中一块地方的泥土,换上粘土。
—— 《柯林斯英汉双解大词典》
5·If a contractor is working in your home, you don't need to tell them that there are cameras watching.
如果有个承包商在你家里工作,你不需要告诉他们有摄像头在监控。
1·Xu, a former Tsinghua University professor who is now the vice general manager of Chinergy, the contractor building the reactors here.
清华大学前教授,现任中核能源科技有限公司(Chinergy,石岛核反应堆建设工程的承包方)副总经理徐博士说道。
2·These questions are general and commonly used by the management of any diligent contractor to better understand what might affect the success of the program.
任何一位勤奋的承包方通常都会将这些问题用于管理之中,从而更好地理解是哪些方面影响着项目的成功。
3·The Contractor shall also, if the Purchaser so requires, insure the Plant.
如果买方要求,承包方也应为设备进行投保。
4·If, for any reason for which the Contractor is not responsible, the Purchaser fails to remedy his default within such period, the Contractor may by notice in Writing terminate the Contract.
如果买方不能在合理期限内对其过失进行弥补,无论何种原因,承包方无需承担任何责任,并可书面通知买方终止合同。
5·The Contractor is not liable for defects arising out of materials provided, or a design stipulated or specified by the Purchaser.
承包方不对因买方提供的原料,或买方规定或指定的设计造成的瑕疵承担责任。
1·The contract defines the apportionment of risks between employer and contractor.
合同规定了雇主与承包人分担的风险。
—— 《牛津词典》
2·We do need to find office space and equipment for each contractor.
我们需要为每个承包人找到办公空间和设备。
3·Bids take months longer than necessary to complete, one contractor complains, because the procurement staff cannot get their technical specifications straight.
一个承包人抱怨说,由于采购人员弄不清楚技术参数,因而投标比需要的时间长出了数月。
4·Of course, there is no guarantee that a licensed contractor will work more efficiently, in terms of cost and schedule, than an unlicensed one.
当然,不保证被许可的承包人比未许可的在成本和进度上工作的更有效率。
5·A good analogy for a constructor method is a building contractor, who takes the blueprints for your house and builds it.
构造函数方法好比建筑承包人,它利用房子的设计图建房子。
1·You can expect repair costs to soar after a disaster, by the way, because every available contractor will be working overtime.
你要知道灾后的建筑费用会飙升,顺便说一句,这也有承包者们不停加班的原因。
2·The civil engineering contractor may need to lay out his own casting yard.
土木工程承包者可能需要设置自己的预制场。
3·A good specification will expand or clarify drawing notes, define quality of materials and workmanship, establish the scope of work, and spell out the responsibilities of the prime contractor.
一份好的说明书将使图纸说明得到扩展和澄清,规定材料和技术质量,规定施工范围,并指出直接承包者的职责。
4·Specifications are addressed to the prime contractor. They present a written description of the project in an orderly and logical manner.
说明书是针对直接承包者的。说明书对工程项目提供顺序井然、层次清晰的文字说明材料。
5·The contractor provided integrated construction solutions from the technical proposals presented at tender stage - with direct contribution of all sectors involved in the completion of components.
承包者在提供集成从投标阶段提出的技术建议与在组件完成的所有部门的直接贡献-建筑解决方案。
1·The contractor also will support the design, prototyping, and evaluation of new logistics applications and concepts, the announcement said.
声明说,承建商也将支持设计,开发,以及新的物流理念的应用和评价。
2·Have your building contractor and landscaper work together during the design and building process, communicating about slope issues, drainage, site and soil conditions.
有在设计和建设过程中的景物建筑承建商和一起工作,有关斜坡的问题,渠务,地盘和土壤条件下进行沟通。
3·More than once a contractor had put on enough sand to raise the street to official grade.
承建商曾不只一次铺设大量的砂子将街道提高到规定的标高。
4·From my observation as a building contractor, the 'wearing course' of the new road surface could be TOO FINE or TOO SMOOTH and TOTALLY UNSUITABLE for highway use!
从我的观察,作为建筑承建商,认为这是“当然'的新路面可能太细或太顺利,完全不适合公路使用!”