1·The coefficient of compaction is 1.22 on the mechanical loader.
机械装载机的压实系数为1.22。
2·There should be sufficient space between the resulting columns of bars to allow access for vibrators and good compaction of the concrete.
钢筋之间应该有足够的空间允许振捣器进入混凝土振捣和并使混泥土能良好的压实。
3·Road compaction machinery is one of main machinery in road construction, the paper main discusses the situation and technical development of the machinery.
道路压实机械是筑路工程中主要机械之一,本文主要阐述此类机械的现状及技术发展趋势。
4·Macadam should be layered paving compaction.
级配碎石应分层摊铺压实。
5·Where permanent formwork is incorporated in the structure extra care is required, as full compaction of the concrete cannot be checked after the formwork is removed.
当使用永久模板时,应特别小心,因为移掉模板后,不能够检查出混凝土是否完全压实。
1·You should be able to feel and see your skin become smoother, compaction and compact.
您应该可以感觉到与看到您的皮肤变的较平滑、紧实与紧致。
2·Future research needs to study the dynamics of the compaction problem to determine how frequent moldboard or deep tillage is needed.
将来需要研究紧实问题的动力学以确定需要几次有壁犁深耕。
3·The formation of arch effects will bring the sand filling over the region of deep concavity hindered and the degree of compaction of molding sand at the deep concavity reduced.
它的形成会阻碍型砂向深凹区的填充,使得深凹处砂型紧实度降低。
4·The dynamic stress inside green sand during experimental compaction by air impact moulding can be achieved using a method of placing aluminium plate at the top of green sand.
采用气冲造型机并在型砂顶部覆盖铝板的方法,获得了气力冲击造型试验紧实过程中型砂内部的动态应力。
5·After vibration time gets to certain value, delaying vibration time again is of no service to more compaction of sand.
振动到达一定时间后,再延长振动时间无益于砂子的进一步紧实。