1·Therefore, ve is the better means to solve the long existing problems of long duration, high waste, unstable quality and high cost in architecture industry.
因此,价值工程是解决建筑业长期存在的工期长、浪费大、质量不稳定、造价高问题的较好办法。
2·Finally the activity of VE is to summarize and evaluate the situation of the optimal plan, including economic benefit evaluation of enterprise and social effect evaluation.
价值工程活动的最后是对优选方案实施的情况进行总结评价,包括企业经济效益评价和社会效果评价。