1·What happens to systems not under the control of the synchronization service?
系统不在同步服务的控制范围内,会发生什么?
2·If time synchronization is not a problem in your enterprise Intranet, you can ignore this section.
如果时间同步在您的企业内部网中不是问题,您可以略过这部分。
3·It's important to note, however, that this process is not truly synchronization, because there is no conflict resolution involved.
然而,因为没有涉及到冲突解决,所以这一过程并不是真正的同步,注意这一点很重要。
4·After the successful configuration of both systems, the next step is the actual synchronization.
成功地配置两个系统之后,下一步是执行实际的同步。
5·The idea is to avoid the costly synchronization for all invocations of the method except the first.
这个想法是为了避免对除第一次调用外的所有调用都实行同步的昂贵代价。
1·You can either add the user who will be executing the synchronization to the project or modify the project Settings so that all users have this permission.
您可以向项目添加执行同步化的用户,或者编辑项目设置,这样所有的用户都拥有该许可权了。
2·Secondly you need to setup a synchronization rule.
第二您需要创建一个同步化规则。
3·The protocol type that you select in the transformation configuration determines the synchronization level between the source model and the target code.
您在转换配置中选择的协议种类,决定了源模型与目标代码之间的同步化水平。
4·In such a situation, integration through synchronization is a recommended approach.
在这种条件下,通过同步化的集成是推荐的方法。
5·You may need to add synchronization into your other two scripts.
您可以将同步化添加到您另两个脚本中。