1·The World Bank loan will finance construction of Shihutang Complex comprised of sluice gates, a ship lock, a power station with an installed capacity of 120 MW, a dam and an access road.
世界银行贷款资金将用于建设石虎塘航电枢纽工程,包括闸门、船闸、电站、大坝和进场道路。
2·Ship lock was one of the main engineering projects of the Three Gorges project.
三峡船闸是三峡工程的主要工程之一。
3·According to the field observation, model test and theoretical analysis, the schemes for anti-icing method of ship lock gate are put forward in this paper.
文章通过现场观测、模型试验、理论分析等手段和方法对该问题进行了初步研究探讨,提出了船闸闸门的防冻防冰措施方案。
4·The article details material selection, grouting technology and quality inspection in the treatment of defects in concrete of the permanent ship lock of Three Gorges.
针对三峡永久船闸工程混凝土缺陷的类型,介绍了缺陷治理选用的材料,并对灌浆工艺、施工注意要点、灌浆质量检验作了详细介绍。
5·Ship lock is one hole, belong to grade four waterway, traffic ability's ability is 500 tons.
船闸一孔,为四级航道,设计通航能力为500吨级。