1·Use level survey to mark the paving design elevation of the cement stabilized macadam with obvious mark on indication piles both sides.
利用水准测量,在两侧指示桩上用明显标记标出,水泥稳定碎石的铺筑设计标高。
2·The results indicate that using cement stabilized aeolian sand and macadam as base course for road is feasible.
试验结果表明,水泥稳定风积砂碎石做基层在公路上的应用是可行的。
3·The fatigue property of framework-pore structural cement stabilized macadam is comparatively better because the bottom of the girder has formed a layer of grout in the course of forming the girder.
骨架空隙结构水泥稳定碎石的疲劳性能相对较好的原因是因为在成型梁的时候在梁的底部形成了一层水泥浆体。
4·This name for the MacAdam building principle is still in use today.
这个名称的碎石建设原则,是目前仍在使用的。
5·Combining engineering practice, the handling failure course and reinforcement measures in a Yuncheng office building's macadam piles compound ground a re introduced.
结合实际工程,介绍了运城市某局办公大楼碎石桩复合地基处理失效的原因及补强措施。