1·Therefore, based on the field data obtained, stope stability can be forecasted.
在此基础上,可以根据获得的现场资料,预测采场的稳定性。
2·The mode for evaluating stope reliability built here can not only be used for the stopes of non-coal mines, but also for all sorts of mines.
所建立的采场可靠性模糊综合评价模式,不仅适用于非煤矿山采场,而且适用于各种类型的矿山采场。
3·Water drainage in hollow open pit stope is a key link of production.
凹陷露天采场排水是一个十分重要的生产工艺环节。
4·Based on the spatial analysis method of elasticity mechanics, the relation between the shape of the plane stope and horizontal construction stress was analysed.
利用弹性力学的空间分析方法分析了采场平面形状与水平构造应力之间的关系。
5·Correctness of the mining method and stope structural parameters is one of the key factors in determining the economically reasonable development of underground deposits.
采矿方法和采场结构参数的正确与否是确定经济合理开发地下矿床的关键因素之一。