1·In a leader, installed in the upper crossbeam gabion stone kg, plus kg load under the action of external load, while the central beam bending deformation, but the wire cage has not broken beam.
在一组长,内装公斤块石的铅丝笼横梁上部,加上公斤的荷重,在外荷作用下,梁的中部虽然发生弯曲变形,但铅丝笼梁却始终未断裂破坏。
2·The control system inspects and optimizes the movement of polish head, crossbeam and belt to expert polishing.
操作系统能检查和优化抛光刀头,横梁和传送带的移动,以达到专业的抛光效果。
3·The elasticity support rigidity crossbeam method is brought forward according to orientation structure endure force character of skew bridge with multilongitudinal beams.
根据多梁式斜梁桥结构及其横向受力特点,提出了“弹性支承刚性横梁法”进行跨中荷载横向分布的计算。
4·The dissertation presents a new design approach of hierarchy optimization to design the crossbeam.
论文以“九自由度运动模拟系统”为背景对横梁进行分级优化设计。
5·The results prove that increasing the height of the crossbeam is the most reasonable solution both in technology and in economy for improving the stiffness of mill housing.
研究结果表明,增加机架横梁的高度是改善轧机机架刚度最有效也是最经济合理的方法。