1·The data from a large - scale consolidation test are important for the stress and strain analysis of a dam foundation.
大型固结试验所获得的参数,是坝基应力应变分析的重要数据,而此项试验研究工作,在东北地区尚未广泛开展。
2·In consideration of the rock characteristics, formation, rock structure, unloading and weathering, the quality of rock body in the dam foundation has been classified.
在考虑了岩性、构造、岩体结构、卸荷和风化等诸因素后,对大坝坝基岩体进行了岩体质量类别划分。
3·The dam foundation engineering geological problem is the bed rock deep weathering in Malutang water complex.
马鹿塘水利枢纽坝基主要工程地质问题就是基岩深风化问题。
4·In the Chongqing Jiangkou Hydroelectric Power Station, dam foundation stress cycle grows multitudinous bands, faults, limestone caves and other disadvantageous geological combination.
重庆江口水电站坝基应力范围内发育众多夹层、断层、溶洞等不利地质组合。
5·Introduced in the paper are the principle and method of borehole elastic modulus inspection and sound wave inspection used in the quality inspection of grouted rock mass of a dam foundation.
主要介绍采用钻孔弹模法和声波法对灌浆处理后的坝基岩体进行质量检测的原理和方法。